Design And Implementation Of Nysc Orientation Camp Information System
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: 65 pages | 1-5 chapters | Amount: ₦5,000 | 2 orders. | Marked useful: 6,005 times
INSTANT PROJECT MATERIAL DOWNLOADABSTRACT
This Project Design and Implementation of Orientation Camp Information System (A Case Study of NYSC Orientation Camp Awgu ) was designed to eliminate the problems associated with manual handling of information at the Orientation Camp such as: data redundancy, time wastage etc. The Design and Implementation was carried out using the top down software development approach. The tools used to implement this project are VB.Net and SQL Server.
TABLE OF CONTENTS
Title page
Certification- - - - - - - - - i
Dedication- - - - - - - - - - ii
Acknowledgement- - - - - - - - iii
Abstract - - - - - - - iv
Table of contents- - - - - - - - v
List of figures- - - - - - - - - viii
List of tables- - - - - - - - - ix
CHAPTER ONE
INTRODUCTION
1.1 Background of the project- - - - - - 1
1.2 Statement of problems - - - - - - 2
1.3 Objectives of the project - - - - - 2
1.4 Justification for the project - - - - - - 3
1.5 Scope of the project - - - - - - - 3
1.6 Projects report organization - - - - - - 3
CHAPTER TWO
LITERATURE REVIEW
2.1 An overview of Nigeria youth service corps - - - 5
2.2 Operation of the NYSC scheme - - - - - 8
2.3 Four phase programme of the NYSC - - - - - 9
2.3.1 Mobilization - - - - - - - - 9
2.3.2 Orientation Programme - - - - - 9
2.3.3 Primary Assignment - - - - - - 10
2.3.4 Community Development Service- - - - 11
2.3.5 Winding programme and Passing out Parade - - 12
2.4 Orientation Process for Prospective (NYSC) Members- 13
2.4.1 Orientation course/Duration - - - - - 13
2.4.2 Registration- - - - - - - - 14
2.4.3 Meal ticket/feeding - - - - - - - 15
2.4.4 Accommodation on camp- - - - - - 15
2.4.5 Orientation Broadcasting service (OBS) - - - 15
2.4.6 Platoon and platoon activities- - - - - 16
2.4.7 Kit Items/ Mode of Dressing- - - - - - 17
2.4.8 Discipline- - - - - - - - - 17
2.4 .9Security - - - - - - - - - 18
2.5 ID Cards- - - - - - - - - 18
2.5.1 Medical care - - - - - - - - 18
2.5.2 Camp market- - - - - - - - 19
2.5.3 Socials- - - - - - - - - 19
2.5.4 Posting- - - - - - - - - 19
2.5.5 Relocation- - - - - - - - - 20
2.5.6 Exeat- - - - - - - - - 20
2.5.7Religious Activities at Orientation Camp - - - 20
2.5.8 Corps Allowance - - - - - - - 20
2.5 .9Prominent Activities on Camp - - - - 21
CHAPTER THREE
SYSTEM ANALYSIS AND DESIGN
3.1 Methodology - - - - - - - - 22
3.1.1 Methods of data collection - - - - - 22
3.2 Data Analysis - - - - - - - 22
3.3 Analysis of the existing system - - - - - 23
3.4 Limitations of the existing system - - - - 24
3.5 system design - - - - - - - - 24
CHAPTER FOUR
IMPLEMENTATION, TESTING AND INTEGRATION
4.1 Choice of programming language - - - - - 31
4.2 System requirement - - - - - - - 31
4.2.1 Software requirements - - - - - - 31
4.2.2 Hardware requirements - - - - - - 31
4.3 Implementation - - - - - - - - 32
4.4.1 Unit testing - - - - - - - - 35
4.4.2 System testing - - - - - - - 38
CHAPTER FIVE
SUMMARY, LIMITATIONS AND CONCLUSION
5.1 Summary - - - - - - - - 39
5.2 Limitations of the project - - - - - - 39
5.3 Bill of engineering measurement and evaluation - - 40
5.4 Conclusion - - - - - - - - - 40
BIBILIOGRAPHY
APPENDIX A
PROGRAM SOURCE CODE
APPENDIX B
SAMPLE OUTPUT
APPENDIX C
USER GUIDE
LIST OF FIGURES
3.1 The NYSC Registration Form - - - - - 27
3.2 The Posting Form - - - - - - - 28
3.3 The System Flowchart - - - - - - 29
3.4 The Top Down Design - - - - - - 30
4.3.1 The NYSC Login Window - - - - - 33
4.3.2. Admin Form Window - - - - - - 34
LIST OF TABLES
Table 1 Unit Testing - - - - - - - 35
Table 2 project costing - - - - - - - 40
CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND OF THE STUDY
The national youth service corps (NYSC) is an organization set by the Nigerian government to involve the country’s graduates in the development of the country. There is no military conscription in Nigeria, but since 1973 graduates of universities and later polytechnics have been required to take part in the national youth service corps (NYSC) program for one year. This is known as national service year, corps members are posted to cities far from their city of origin. They are expected to mix with people of other tribes, social and family backgrounds, to learn the culture of the indigenes in the place they are posted to. This action is aimed to bring about unity in the country and to help youth appreciate other ethnic groups. There is an orientation period of approximately three weeks spent in a camp away from family and friends. After the orientation process corps members are posted to the areas of primary assignment. There is also a passing out ceremony at the end of the year. The program has also helped in creating entry-level jobs for a lot of Nigerian youths. An NYSC
forum dedicated to NYSC members was recently built to bridge the gap amongst members serving across Nigeria and also serves as an avenue for corps members to share job information and career resources as well as get loans from the national directorates of employment.
1.2 STATEMENT OF PROBLEMS
The NYSC is faced with the following problems due to their manual method of handling information:
Poor handling of corps members’ information
Time wastage in searching for information
Data redundancy
1.3 OBJECTIVES OF THE PROJECT
The objectives of this project are as follows:
To design an information system that makes data access easy for corps members.
To design a system that can automatically post corps members to their areas of primary assignment.
To design a system that can help the NYSC management to supervise corps members.
1.4 JUSTIFICATION OF THE STUDY
The good reason why this project is done is to provide an efficient method of handling corps members’ data at the orientation.
1.5 SCOPE OF THE STUDY
This project covers the design and implementation of information system for the NYSC orientation camp (A case study of Awgu)
This material content is developed to serve as a GUIDE for students to conduct academic research
DOWNLOAD THIS PROJECT MATERIAL NOW!
Advertise Here
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
INVESTIGATING FORENSIC AUDIT AS A PANACEA FOR PREVENTING CORPORATE FRAUD IN CAMEROON'S PUBLIC SECTOR
CHAPTER ONE INTRODUCTION 1.1 Background of the study The proliferation of financial crimes in these developing economies is concerning and catastrophi...More »
Item Type: Project Material | 54 pages | 451 engagements |
- 2.
INTERNAL AUDIT: EXAMINING ITS ROLE IN ENSURING ETHICAL CONDUCT IN CHENWI-ASSOCIATES, CAMEROON
INTERNAL AUDIT: EXAMINING ITS ROLE IN ENSURING ETHICAL CONDUCT IN CHENWI ASSOCIATES, CAMEROON CHAPTER ONE INTRODUCTION Background of the Study Auditin...More »
Item Type: Project Material | 54 pages | 382 engagements |
- 3.
EXTERNAL AUDIT AND QUALITY OF ACCOUNTING AND FINANCIAL INFORMATION IN THE CAMEROONIAN PUBLIC SECTOR
CHAPTER ONE INTRODUCTION 1.1 Background of the study The main purpose of external audit as a governance mechanism is to enhance the accuracy and trust...More »
Item Type: Project Material | 54 pages | 445 engagements |
- 4.
EXAMINING THE ROLE OF FORENSIC AUDIT IN DETECTING FINANCIAL FRAUDS IN THE CAMEROONIAN PUBLIC SECTOR:...
CHAPTER ONE INTRODUCTION 1.1 Background of the study Forensic auditing and forensic accounting are often used interchangeably. It has been officially ...More »
Item Type: Project Material | 54 pages | 395 engagements |
- 5.
EXAMINING THE IMPACT OF THE AUDIT REPORT ON INVESTMENT IN FINANCIAL INSTITUTIONS IN CAMEROON
CHAPTER ONE INTRODUCTION 1.1 Background of the study According to the Companies Act, all registered companies must present audited accounts to their s...More »
Item Type: Project Material | 54 pages | 391 engagements |
- 6.
EXAMINATION OF CHALLENGES ENCOUNTERED BY INTERNAL AUDITORS IN PUBLIC SECTOR AUDIT OF CAMEROON
CHAPTER ONE INTRODUCTION 1.1 Background of the study The demand for internal auditing mostly arises from the necessity for an independent verification...More »
Item Type: Project Material | 54 pages | 426 engagements |